So I thought I would share with you all my "master things to do list" that I started with by room and where we are at with each thing so you can see how far we've come since I took possession the first part of Sept.
Kitchen and dining room area:
get refrigerator (have, need to still double check the floor under where it goes before moving it into its spot but its up and running)
paint (just need to finish the cabinet doors and the moldings)
address the ceiling tiles
level the counter
tile the counters
fix the moldings
need window sills
secure the fan and get it the bulb covers/globes
replace/remove the weird light on the wall in the dining room area
wash the floor (several times already LOL)
contact paper the kitchen cupboard shelves (done)
hardward for cabinets (done)
make and hang curtains (done)
garbage disposal (it was just hanging live wires.. its at least safely capped for now and will be reconnected soon)
recover the seats to the chairs and fix the one that was broke in the move
make the pantry bigger/most functional for me
Living room:
rehang the door
address closet door (there isn't one)
fix the vents
flooring
the weird "hole" for TV
door molding
paint
couches (just need to pick up from Catt)
Master Bedroom and "bike room":
knob for door to hall
PAINT!!!
vents in floor
flooring
overhang btw rooms
close off sockets properly
water heater doors
water heater issues
molding around windows
move wall that is shared with the boy's room (done)
make and hang curtains
paint/get new door with wierd semi scary painting on it
door to dining room - sprayed with bleach to address potential termite issue (done)
Boy's room
knobs for dresser
door to back yard (unscrewed shut and painted now)
paint
flooring
fix vent
need lighting (done)
holes in wall
need rug
artwork (purchased most of it)
building nightstand and lamp
Curtains (partially done)
Bean's room
flooring
all new subfloor (done)
paint (done)
repair ceiling fan (done)
fix glass in window
closet shelves
cover outlets
make and hang curtains (valances are done and hung)
frame mirror
rug
cover electrical box
frame windows
bathroom/laundry area
remove laundry shelf (done)
tub spout and faucet (done)
floor
fix vent wall area (done)
tile at tub base
light in bath area needed
toilet paper holder needed
make linen area
hook up washer and dryer (since we flipped them from where the vanity was before the drain for the washer still needs to be done)
framing on mirror
create new wall so there is a hallway
long hallway
panelling issues
outside door access
rehang heater area doors
flooring
smoke detector (needs to be hung)
curtains
light
chair railing
screens in windows
window sill installed
Porch
clean it out (done)
window issues
door frames
tear out carpet
would love to get a bench with storage for shoes, hats/mittens/etc
outside
add porch railing
clean up (working on)
lock on shed
timbers on flower bed needs to be fixed
flowers (bought the seeds and stuff)
would love a patio set
plug for my turtle and minion
soft spots on porch
steps in back need to be fixed
take down the security camera that isn't working
we've also realized the motion detector lights need to be adjusted to shine on the steps
and the roof has some serious issues
heating ducts have been damaged as well under and aren't working so that needs to be dealt with asap. we've redone most of the water lines now as well. yikes
it doesn't seem like we have gotten much done when I look at this list but I know we have.